ORDER NO.
PIONEER CORPORATION 4-1, Meguro 1-chome, Meguro-ku, Tokyo 153-8654, Japan
PIONEER ELECTRONICS (USA) INC. P.O. Box 1760, Long Beach, CA 90801-1760, U.S.A.
PIONEER EUROPE NV Haven 1087, Keetberglaan 1, 9120 Melsele, Belgium
PIONEER ELECTRONICS ASIACENTRE PTE. LTD. 253 Alexandra Road, #04-01, Singapore 159936
PIONEER CORPORATION 2003
CDJ-1000MK2
RRV2802
COMPACT DISC PLAYER
CDJ-1000MK2
THIS MANUAL IS APPLICABLE TO THE FOLLOWING MODEL(S) AND TYPE(S).
Model
Type
Power Requirement
Remarks
CDJ-1000MK2
KUCXJ
AC120V
CDJ-1000MK2
TLXJ
AC110- 240V
CDJ-1000MK2
WYXJ
AC220- 240V
For details, refer to "Important symbols for good services"
T-ZZY JULY 2003 printed in Japan
CDJ-1000MK2
2
1234
123
4
C
D
F
A
B
E
SAFETY INFORMATION
This service manual is intended for qualified service technicians ; it is not meant for the casual do-it-
yourselfer. Qualified technicians have the necessary test equipment and tools, and have been trained
to properly and safely repair complex products such as those covered by this manual.
Improperly performed repairs can adversely affect the safety and reliability of the product and may
void the warranty. If you are not qualified to perform the repair of this product properly and safely, you
should not risk trying to do so and refer the repair to a qualified service technician.
WARNING
This product contains lead in solder and certain electrical parts contain chemicals which are known to the state of California to cause
cancer, birth defects or other reproductive harm.
Health & Safety Code Section 25249.6 Proposition 65
NOTICE
(FOR CANADIAN MODEL ONLY)
Fuse symbols
(fast operating fuse) and/or
(slow operating fuse) on PCB indicate that replacement par ts must
be of identical designation.
REMARQUE
(POUR MODÈLE CANADIEN SEULEMENT)
Les symboles de fusible
(fusible de type rapide) et/ou
(fusible de type lent) sur CCI indiquent que les pièces
de remplacement doivent avoir la même désignation.
ANY MEASUREMENTS NOT WITHIN THE LIMITS
OUTLINED ABOVE ARE INDICATIVE OF A POTENTIAL
SHOCK HAZARD AND MUST BE CORRECTED BEFORE
RETURNING THE APPLIANCE TO THE CUSTOMER.
2. PRODUCT SAFETY NOTICE
Many electrical and mechanical parts in the appliance
have special safety related characteristics. These are
often not evident from visual inspection nor the protection
afforded by them necessarily can be obtained by using
replacement components rated for voltage, wattage, etc.
Replacement par ts which have these special safety
characteristics are identified in this Service Manual.
Electrical components having such features are identified
by marking with a
on the schematics and on the parts list
in this Service Manual.
The use of a substitute replacement component which does
not have the same safety characteristics as the PIONEER
recommended replacement one, shown in the parts list in
this Service Manual, may create shock, fire, or other hazards.
Product Safety is continuously under review and new
instructions are issued from time to time. For the latest
information, always consult the current PIONEER Service
Manual. A subscription to, or additional copies of, PIONEER
Service Manual may be obtained at a nominal charge from
PIONEER.
1. SAFETY PRECAUTIONS
The following check should be performed for the
continued protection of the customer and ser vice
technician.
LEAKAGE CURRENT CHECK
Measure leakage current to a known earth ground (water
pipe, conduit, etc.) by connecting a leakage current tester
such as Simpson Model 229-2 or equivalent between the
earth ground and all exposed metal parts of the appliance
(input/output terminals, screwheads, metal overlays, control
shaft, etc.). Plug the AC line cord of the appliance directly
into a 120V AC 60Hz outlet and turn the AC power switch
on. Any current measured must not exceed 0.5mA.
(FOR USA MODEL ONLY)
Leakage
current
tester
Reading should
not be above
0.5mA
Device
under
test
Test all
exposed metal
surfaces
Also test with
plug reversed
(Using AC adapter
plug as required)
Earth
ground
AC Leakage Test
CDJ-1000MK2
3
5
678
56
7
8
C
D
F
A
B
E
IMPORTANT
THIS PIONEER APPARATUS CONTAINS
LASER OF CLASS 1.
SERVICING OPERATION OF THE APPARATUS
SHOULD BE DONE BY A SPECIALLY
INSTRUCTED PERSON.
LASER DIODE CHARACTERISTICS
MAXIMUM OUTPUT POWER: 5 mW
WAVELENGTH: 780 785 nm
WARNING !
The AEL(accessible emission level) of the laser power output is less then CLASS 1
but the laser component is capable of emitting radiation exceeding the limit for
CLASS 1.
A specially instructed person should servicing operation of the apparatus.
LABEL CHECK
CDJ-1000MK2/ WYXJ Type Only
CDJ-1000MK2/ TLXJ Type Only
Printed on the Bottom Plate 2.
Bottom Plate 2
: Refer to page 68.
1. Laser Interlock Mechanism
The position of the switch (S510) for detecting loading
completion is detected by the system microprocessor,
and the design prevents laser diode oscillation when the
switch is not in LPS1 terminal side (when the mechanism
is not clamped and LPS1 signal is high level.)
Thus, the interlock will no longer function if the switch is
deliberately set to LPS1 terminal side. ( if LPS1 signal is
low level ).
In the test mode* the interlock mechanism will not function.
Laser diode oscillation will continue, if pin 4 of AN8702NFH
(IC800) on the MAIN ASSY is connected to GND, or else
the terminals of Q600 are shorted to each other (fault
condition).
2. When the cover is opened, close viewing of the objective
lens with the naked eye will cause exposure to a Class 1
laser beam.
Additional Laser Caution
CDJ-1000MK2
4
1234
123
4
C
D
F
A
B
E
[ Important symbols for good services ]
In this manual, the symbols shown-below indicate that adjustments, settings or cleaning should be made securely.
When you find the procedures bearing any of the symbols, be sure to fulfill them:
2. Adjustments
To keep the original performances of the product, optimum adjustments or specification confirmation is indispensable.
In accordance with the procedures or instructions described in this manual, adjustments should be performed.
3. Cleaning
For optical pickups, tape-deck heads, lenses and mirrors used in projection monitors, and other parts requiring cleaning,
proper cleaning should be performed to restore their performances.
5. Lubricants, glues, and replacement parts
Appropriately applying grease or glue can maintain the product performances. But improper lubrication or applying
glue may lead to failures or troubles in the product. By following the instructions in this manual, be sure to apply the
prescribed grease or glue to proper portions by the appropriate amount.For replacement parts or tools, the prescribed
ones should be used.
4. Shipping mode and shipping screws
To protect the product from damages or failures that may be caused during transit, the shipping mode should be set or
the shipping screws should be installed before shipping out in accordance with this manual, if necessary.
1. Product safety
You should conform to the regulations governing the product (safety, radio and noise, and other regulations), and
should keep the safety during servicing by following the safety instructions described in this manual.
CDJ-1000MK2
5
5
678
56
7
8
C
D
F
A
B
E
CONTENTS
1. SPECIFICATIONS .............................................................................................................................................6
2. EXPLODED VIEWS AND PARTS LIST.............................................................................................................7
2.1 PACKING ....................................................................................................................................................7
2.2 EXTERIOR SECTION (1/2) ........................................................................................................................8
2.3 EXTERIOR SECTION (2/2) ......................................................................................................................10
2.4 SLOT-IN MECHANISM SECTION ............................................................................................................12
2.5 TRAVERSE MECHANISM ASSY-S ..........................................................................................................13
3. BLOCK DIAGRAM AND SCHEMATIC DIAGRAM ..........................................................................................14
3.1 BLOCK DIAGRAM ....................................................................................................................................14
3.2 OVERALL WIRING DIAGRAM .................................................................................................................16
3.3 MAIN (1/4) and SPCN ASSYS .................................................................................................................18
3.4 MAIN (2/4), FLRB and SLMB ASSYS ......................................................................................................20
3.5 MAIN (3/4) and MMCB ASSYS ................................................................................................................22
3.6 MAIN ASSY (4/4)......................................................................................................................................24
3.7 DABB, JACB and DOUT ASSYS ..............................................................................................................26
3.8 MFLB (1/2) and RSWB ASSYS ................................................................................................................28
3.9 MFLB (2/2) ASSY .....................................................................................................................................30
3.10 KSWB and SLDB ASSYS.......................................................................................................................31
3.11 JFLB and JOGB ASSYS.........................................................................................................................32
3.12 SW POWER SUPPLY and PSWB ASSYS .............................................................................................34
4. PCB CONNECTION DIAGRAM ......................................................................................................................42
4.1 MAIN ASSY ..............................................................................................................................................42
4.2 SPCN, STCN, FLRB, SLMB and MMCB ASSYS .....................................................................................46
4.3 DABB, JACB and DOUT ASSYS ..............................................................................................................48
4.4 MFLB and RSWB ASSYS ........................................................................................................................50
4.5 KSWB ASSY.............................................................................................................................................54
4.6 SLDB ASSY..............................................................................................................................................55
4.7 JFLB and JOGB ASSYS...........................................................................................................................56
4.8 SW POWER SUPPLY and PSWB ASSYS ...............................................................................................58
5. PCB PARTS LIST ............................................................................................................................................59
6. ADJUSTMENT ................................................................................................................................................64
7. GENERAL INFORMATION .............................................................................................................................65
7.1 DIAGNOSIS ..............................................................................................................................................65
7.1.1 SERVICE MODE ................................................................................................................................65
7.1.2 DISASSEMBLY ..................................................................................................................................75
7.1.3 On Discharge of the Capacitor ...........................................................................................................80
7.1.4 CLEANING .........................................................................................................................................80
7.1.5 POWER ON SEQUENCE ..................................................................................................................81
7.2 PARTS ......................................................................................................................................................84
7.2.1 IC........................................................................................................................................................84
8. PANEL FACILITIES .........................................................................................................................................93